70MW.
A renewable 70MW Solar Farm. The initial consideration for the basis of a 70 MW solar installation used a reference site of NREL PV Watt Data provides the following:
A 70 MW solar installation will require appreciably 175,000 Jinko 395 watt or superior Solar Panels.
This will provide an optimal solar production yield of 108,240 MW/hr PA.
The Solar panels proposed for this project has been considered for the overall performance of the site, and the amount of production yield.

A total energy solution for the Hunter Energy Zone.

World’s largest grid-scale battery
1,200MW
A cleaner, decarbonised future in the Hunter region via the world’s biggest battery storage project.

Peaking Power Plant
120MW
Featuring Cummins QSK60 generator sets with Selective Catalytic Reduction technology.

Decommissioned Coal Fired Power Station
The construction of the Power Station (1,000kW) began on HEZ land in 1908.