70MW.

A renewable 70MW Solar Farm. The initial consideration for the basis of a 70 MW solar installation used a reference site of NREL PV Watt Data provides the following:

​A 70 MW solar installation will require appreciably 175,000 Jinko 395 watt or superior Solar Panels.

This will provide an optimal solar production yield of 108,240 MW/hr PA.

The Solar panels proposed for this project has been considered for the overall performance of the site, and the amount of production yield.

Solar install

A total energy solution for the Hunter Energy Zone.

Battery Storage

World’s largest grid-scale battery

1,200MW

A cleaner, decarbonised future in the Hunter region via the world’s biggest battery storage project.

Peaking Power 120MW

Peaking Power Plant

120MW

Featuring Cummins QSK60 generator sets with Selective Catalytic Reduction technology.

Decommissioned Coal Fired Power Station

Decommissioned Coal Fired Power Station

The construction of the Power Station (1,000kW) began on HEZ land in 1908.

Crane

Waste to Energy Station

70MW

Capacity to handle 1,200 tons of garbage per day and generate 175 million KWH per year.

Renewable Solar Panels

Solar Project

70MW

Renewable 70MW Solar Farm providing an optimal solar yield of 108,240 MW/hr PA.