The construction of the Power Station began on HEZ land in 1908. The first generator, dating from 1911, was of 1,000kW capacity and another 1,000kW machine was installed in 1913. The power station was producing ealectricity by 1912, supplying power to the developing Richmond Main Colliery as well as the nearby Pelaw Main Colliery where it displaced steam as the motive power.
With the demand for more power, planned to increase with the proposed opening of Stockrington Colliery, a 3,000kW generator built by the General Electric Company, Birmingham, England, was installed in 1922. In 1927 a 6,000kW generator, also built by General Electric, was purchased with installation being completed in 1928. During the life of the power station electricity was supplied to the following Colliery sites – Richmond Main, Pelaw Main, Stanford Main, Abermain Nos. 1, 2, 3, Paxton, Stockrington and Hexham, as well as supplying the townships of Kurri Kurri, Stanford Merthyr and Heddon Greta. One of the original 1,000kW generators was sold for scrap in 1945 whereas the second 1,000kW generator lasted until the mid-1950’s as a standby unit. This left the two General Electric units in use until the Power Station closed in 1976. These two generators survive intact and the lower floor of the power station contains the circulating pumps and other auxiliary equipment that was required for the operation of the turbines.

A total energy solution for the Hunter Energy Zone.

World’s largest grid-scale battery
1,200MW
A cleaner, decarbonised future in the Hunter region via the world’s biggest battery storage project.

Peaking Power Plant
120MW
Featuring Cummins QSK60 generator sets with Selective Catalytic Reduction technology.

Decommissioned Coal Fired Power Station
The construction of the Power Station (1,000kW) began on HEZ land in 1908.