The construction of the Power Station began on HEZ land in 1908. The first generator, dating from 1911, was of 1,000kW capacity and another 1,000kW machine was installed in 1913. The power station was producing ealectricity by 1912, supplying power to the developing Richmond Main Colliery as well as the nearby Pelaw Main Colliery where it displaced steam as the motive power.

With the demand for more power, planned to increase with the proposed opening of Stockrington Colliery, a 3,000kW generator built by the General Electric Company, Birmingham, England, was installed in 1922. In 1927 a 6,000kW generator, also built by General Electric, was purchased with installation being completed in 1928. During the life of the power station electricity was supplied to the following Colliery sites – Richmond Main, Pelaw Main, Stanford Main, Abermain Nos. 1, 2, 3, Paxton, Stockrington and Hexham, as well as supplying the townships of Kurri Kurri, Stanford Merthyr and Heddon Greta. One of the original 1,000kW generators was sold for scrap in 1945 whereas the second 1,000kW generator lasted until the mid-1950’s as a standby unit. This left the two General Electric units in use until the Power Station closed in 1976. These two generators survive intact and the lower floor of the power station contains the circulating pumps and other auxiliary equipment that was required for the operation of the turbines.

Coal Fired Power

A total energy solution for the Hunter Energy Zone.

Battery Storage

World’s largest grid-scale battery

1,200MW

A cleaner, decarbonised future in the Hunter region via the world’s biggest battery storage project.

Peaking Power 120MW

Peaking Power Plant

120MW

Featuring Cummins QSK60 generator sets with Selective Catalytic Reduction technology.

Decommissioned Coal Fired Power Station

Decommissioned Coal Fired Power Station

The construction of the Power Station (1,000kW) began on HEZ land in 1908.

Crane

Waste to Energy Station

70MW

Capacity to handle 1,200 tons of garbage per day and generate 175 million KWH per year.

Renewable Solar Panels

Solar Project

70MW

Renewable 70MW Solar Farm providing an optimal solar yield of 108,240 MW/hr PA.

Have a question?

HEZ Environmental Masterplan along with our newly developed Ecological Constraints Master Plan (ECMP) has won numerous industry awards Nationally and Internationally.